Democracy Gone Astray
Democracy, being a human construct, needs to be thought of as directionality rather than an object. As such, to understand it requires not so much a description of existing structures and/or other related phenomena but a declaration of intentionality.
This blog aims at creating labeled lists of published infringements of such intentionality, of points in time where democracy strays from its intended directionality. In addition to outright infringements, this blog also collects important contemporary information and/or discussions that impact our socio-political landscape.
All the posts here were published in the electronic media – main-stream as well as fringe, and maintain links to the original texts.
[NOTE: Due to changes I haven't caught on time in the blogging software, all of the 'Original Article' links were nullified between September 11, 2012 and December 11, 2012. My apologies.]
Showing posts with label TransCanada. Show all posts
Showing posts with label TransCanada. Show all posts
Sunday, July 29, 2018
Monday, August 14, 2017
TransCanada Admits Keystone XL Pipeline May Never Happen
After nine years of political rhetoric, protests and lobbying, TransCanada's fight to build the Keystone XL pipeline seemed to end in victory for the company in January, when President Donald Trump signed an executive order approving the project.
But fast forward half a year, and the controversial project to bring Canadian oilsands product to the U.S. Gulf Coast is no closer to reality. In an earnings call last week, the company's brass — while remaining optimistic — pretty much admitted the project may never happen.
But fast forward half a year, and the controversial project to bring Canadian oilsands product to the U.S. Gulf Coast is no closer to reality. In an earnings call last week, the company's brass — while remaining optimistic — pretty much admitted the project may never happen.
Saturday, February 06, 2016
Energy East Is Anything But Canadian Oil For Canadians
When TransCanada first announced its 4400km Energy East pipeline project from Alberta to Saint John, the spin was all about nation-building.
At their first news conference, CEO Russ Girling compared Energy East to "bold ventures" such as the Canadian Pacific Railway that evoke civic pride. "Each of these enterprises demanded innovative thinking and a strong belief that building critical infrastructure ties our country together, making us stronger and more in control of our own destiny," said Girling, as quoted in a Macleans article.
At their first news conference, CEO Russ Girling compared Energy East to "bold ventures" such as the Canadian Pacific Railway that evoke civic pride. "Each of these enterprises demanded innovative thinking and a strong belief that building critical infrastructure ties our country together, making us stronger and more in control of our own destiny," said Girling, as quoted in a Macleans article.
Sunday, January 24, 2016
The Company Behind Keystone XL Now Wants $15 Billion From US Taxpayers
In November, environmentalists were ecstatic when President Barack Obama decided not to grant a permit for the Keystone XL pipeline. But TransCanada, the company behind the project, was not so happy. On Wednesday, it filed a lawsuit against the federal government seeking to overturn the permit rejection. At the same time, it gave notice that it plans to pursue compensation under the North American Free Trade Agreement, to the tune of $15 billion.
Sunday, March 22, 2015
Wednesday, November 26, 2014
TransCanada hires controversial PR firm to derail opposition to Energy East pipeline
There are now multiple news articles that report Calgary-based TransCanada hired the controversial public relations firm Edelman in an attempt to derail growing public opposition to its proposed 1.1 million barrels per day Energy East tar sands pipeline. The PR firm began working for TransCanada in February and submitted detailed proposals to them in May and August.
Among the various tactics to be undertaken, Edelman proposed in their Promote, Respond, Pressure document to "prepare a research profile of key opposition groups by examining public records (including financial disclosures, legal databases and legislative records), traditional media sources (news databases such as Lexis-Nexis and Factiva) and social media (Facebook, Twitter and other relevant sites). ...We will begin with the Council of Canadians. Other possibilities include Equiterre, the David Suzuki Foundation, Avaaz and Ecology Ottawa." The overall plan was to "add layers of difficulty for our opponents, distracting them from their mission and causing them to redirect their resources."
Tuesday, November 25, 2014
TransCanada public relations documents on Energy East raise concerns
TransCanada PipeLines acknowledges it considered aggressive tactics such as using proxy groups to attack opponents of the company's proposed Energy East pipeline.
But the Calgary-based pipeline company (TSX:TCA.PR.X) says it did not accept those recommendations outlined in leaked documents from the Edelman public relations firm obtained by Greenpeace.
"Everything that Edelman put forward we've considered," said James Millar, TransCanada's director of communications. "But then it comes down to implementation, and that's not something that we've implemented."
But the Calgary-based pipeline company (TSX:TCA.PR.X) says it did not accept those recommendations outlined in leaked documents from the Edelman public relations firm obtained by Greenpeace.
"Everything that Edelman put forward we've considered," said James Millar, TransCanada's director of communications. "But then it comes down to implementation, and that's not something that we've implemented."
Wednesday, November 05, 2014
TransCanada raises price tag for Keystone XL by half to US$8 billion
CALGARY - The price tag for the controversial Keystone XL pipeline has risen by about half to US$8 billion, TransCanada Corp. (TSX:TRP) said Tuesday as the U.S. regulatory process drags into its seventh year.
TransCanada had previously pegged the cost of Keystone XL at US$5.4 billion, but has long signalled that the longer it's forced to wait for a permit, the more expensive the pipeline would become. As of Sept. 30, TransCanada had sunk $2.4 billion into the project.
TransCanada had previously pegged the cost of Keystone XL at US$5.4 billion, but has long signalled that the longer it's forced to wait for a permit, the more expensive the pipeline would become. As of Sept. 30, TransCanada had sunk $2.4 billion into the project.
Friday, October 31, 2014
TransCanada files application for Energy East
CALGARY - After dozens of open houses and thousands of conversations across six provinces, TransCanada Corp. (TSX:TRP) has filed its regulatory application for its massive cross-Canada Energy East pipeline.
But the hard part for TransCanada (TSX:TRP) was just beginning Thursday as copies of the document — each fills 68 binders in 11 boxes — arrived at the National Energy Board's headquarters in Calgary.
But the hard part for TransCanada (TSX:TRP) was just beginning Thursday as copies of the document — each fills 68 binders in 11 boxes — arrived at the National Energy Board's headquarters in Calgary.
Thursday, October 30, 2014
Landowner refuses to surrender property for Energy East pipeline
Rick Verge was shocked when a TransCanada land agent knocked on his door in Titusville, N.B., last year and offered him $1000 to conduct a land survey in exchange for his signature. He refused. He said the land agent showed him a photo in a brochure of what his land would look like after TransCanada was finished with construction.
The only problem is that the photo in the brochure was a field where there is now a forest, said Verge.
“It’s a forest we use all the time. We have trails through there, campfires, it’s used regularly. To cut a 300 foot swath right through the middle of that, which is what they plan to do, would wreck it,” said Verge.
The only problem is that the photo in the brochure was a field where there is now a forest, said Verge.
“It’s a forest we use all the time. We have trails through there, campfires, it’s used regularly. To cut a 300 foot swath right through the middle of that, which is what they plan to do, would wreck it,” said Verge.
Sunday, October 19, 2014
Keystone XL Oil Pipeline Owner Wins Climate Leadership Award
WASHINGTON -– The company that wants to build the Keystone XL pipeline was recognized this week for leadership on climate change -– to the shock of environmental activists.
Alberta-based TransCanada, which has been seeking permission to build the 1,660-mile pipeline from Canada's oil sands to refineries in Texas, was included as a corporate climate leader on the Carbon Disclosure Project's Climate Performance Leadership Index 2014. The Carbon Disclosure Project, or CDP, is a United Kingdom-based nonprofit that works with companies to tally and report their greenhouse gas emissions. TransCanada was one of five energy sector companies included on the "A List" in this year's report.
Alberta-based TransCanada, which has been seeking permission to build the 1,660-mile pipeline from Canada's oil sands to refineries in Texas, was included as a corporate climate leader on the Carbon Disclosure Project's Climate Performance Leadership Index 2014. The Carbon Disclosure Project, or CDP, is a United Kingdom-based nonprofit that works with companies to tally and report their greenhouse gas emissions. TransCanada was one of five energy sector companies included on the "A List" in this year's report.
Friday, September 19, 2014
TransCanada Pipeline Rupture Prompts Evacuation Of Benton Harbor
TransCanada may have to take a break from trying to convince Canadians and Americans its Keystone XL and Energy East pipelines are safe in order to deal with some pipeline spills.
More than 500 residents of Benton Harbor, Michigan, were forced to leave their homes in the early hours of Tuesday morning for 10 to 12 hours after authorities discovered a leak on a TransCanada gas pipeline in the area, WSBT TV reports.
Police cordoned off a one-square-mile area rural area east of the town for 10 to 12 hours before allowing residents to return home.
More than 500 residents of Benton Harbor, Michigan, were forced to leave their homes in the early hours of Tuesday morning for 10 to 12 hours after authorities discovered a leak on a TransCanada gas pipeline in the area, WSBT TV reports.
Police cordoned off a one-square-mile area rural area east of the town for 10 to 12 hours before allowing residents to return home.
Wednesday, August 06, 2014
TransCanada's Contract With Mattawa Requires Town To Stay Silent About Company
The mayor of a small northern Ontario town along the route of the planned Energy East pipeline is defending a contract with pipeline builder TransCanada that critics say amounts to a “gag order” in exchange for a $30,000 gift.
The town of Mattawa has negotiated a deal that will see TransCanada, builder of Energy East and the Keystone XL pipeline, pay for a $30,000 emergency vehicle for its fire department.
The town of Mattawa has negotiated a deal that will see TransCanada, builder of Energy East and the Keystone XL pipeline, pay for a $30,000 emergency vehicle for its fire department.
Friday, February 28, 2014
TransCanada Whistleblower's Safety Complaints Validated by Regulator
You can't say that pipeline whistleblower Evan Vokes didn't warn North Americans that something was wrong with TransCanada's pipeline safety system.
Almost two years ago, the former TransCanada employee filed a lengthy complaint against the proponent of the Keystone XL line with the National Energy Board (NEB).
It claimed the Calgary-based company routinely cut corners, let business decisions undermine engineering practices, and did not uphold the law governing pipeline safety, such as Onshore Pipeline Regulations-99 (OPR-99).
Almost two years ago, the former TransCanada employee filed a lengthy complaint against the proponent of the Keystone XL line with the National Energy Board (NEB).
It claimed the Calgary-based company routinely cut corners, let business decisions undermine engineering practices, and did not uphold the law governing pipeline safety, such as Onshore Pipeline Regulations-99 (OPR-99).
Thursday, February 27, 2014
TransCanada Pipeline Safety Audit Underscores Concerns: Council Of Canadians
CALGARY - Problems flagged in the National Energy Board's audit of TransCanada Corp.'s pipeline safety practices should have Canadians worried, a group fighting that company's proposed Energy East pipeline said Tuesday.
The audit report, released Monday, found TransCanada (TSX:TRP) to be non-compliant in four of nine areas it examined: hazard identification, risk assessment and control; operational control in upset or abnormal operating condition; inspection, measurement and monitoring, and management review.
The audit report, released Monday, found TransCanada (TSX:TRP) to be non-compliant in four of nine areas it examined: hazard identification, risk assessment and control; operational control in upset or abnormal operating condition; inspection, measurement and monitoring, and management review.
Sunday, February 23, 2014
Environmentalists Continue To Question Keystone Analysts' Ties To TransCanada
WASHINGTON -- An environmental group is again hammering the contractor that created last Friday's environmental impact analysis for the proposed Keystone XL pipeline, arguing that conflicts of interest should have precluded the contractor's work on the report.
The final impact statement on Keystone XL concluded that the pipeline's environmental impacts would be minimal.
But Environmental Resources Management, the contractor that prepared that analysis, has been the subject of conflict of interest complaints since early last year, when it released its initial environmental assessment of the proposed 1,660-mile pipeline from Canada to Texas. After the initial analysis was released, it came to light that several ERM employees had done work for TransCanada and one of its subsidiaries -- a fact that the State Department had redacted from publicly released documents.
The final impact statement on Keystone XL concluded that the pipeline's environmental impacts would be minimal.
But Environmental Resources Management, the contractor that prepared that analysis, has been the subject of conflict of interest complaints since early last year, when it released its initial environmental assessment of the proposed 1,660-mile pipeline from Canada to Texas. After the initial analysis was released, it came to light that several ERM employees had done work for TransCanada and one of its subsidiaries -- a fact that the State Department had redacted from publicly released documents.
Tuesday, February 04, 2014
Pipeline rupture report raises questions about TransCanada inspections
A CBC News investigation has unearthed a critical report that the federal regulator effectively buried for several years about a rupture on a trouble-prone TransCanada natural gas pipeline.
On July 20, 2009, the Peace River Mainline in northern Alberta exploded, sending 50-metre-tall flames into the air and razing a two-hectare wooded area.
Few people ever learned of the rupture — one of the largest in the past decade — other than the Dene Tha’ First Nation, whose traditional territory it happened on.
On July 20, 2009, the Peace River Mainline in northern Alberta exploded, sending 50-metre-tall flames into the air and razing a two-hectare wooded area.
Few people ever learned of the rupture — one of the largest in the past decade — other than the Dene Tha’ First Nation, whose traditional territory it happened on.
Wednesday, December 18, 2013
TransCanada CEO Sees Mexico Oil Pipeline Opportunities If Market Opens
CALGARY - The CEO of TransCanada Corp. sees opportunities to build new oil pipelines in Mexico, which is poised to end its government's monopoly on energy development and open its oilfields up to foreign players.
To the extent that Mexico, already a crude exporter, is able to ramp up its flagging production as a result of the changes, it will likely be eager to send more of its crude to lucrative Asian markets — much as has been the case in Canada in recent years, Russ Girling said.
"That's where companies like us can come in with our capital and our expertise and build the infrastructure necessary to get it to a place where they can export from," he said in an interview.
To the extent that Mexico, already a crude exporter, is able to ramp up its flagging production as a result of the changes, it will likely be eager to send more of its crude to lucrative Asian markets — much as has been the case in Canada in recent years, Russ Girling said.
"That's where companies like us can come in with our capital and our expertise and build the infrastructure necessary to get it to a place where they can export from," he said in an interview.
Tuesday, December 10, 2013
TransCanada: Keystone XL's Southern Leg Now Pumping Oil
CALGARY - Oil has begun to flow on the southern leg of TransCanada Corp.'s (TSX:TRP) Keystone XL pipeline.
Spokesman Shawn Howard says the company began filling the US$2.3-billion line with oil Saturday morning in Cushing, Okla.
That crude will eventually make its way to Houston-area refineries.
Howard says over the coming weeks, TransCanada will inject about three million barrels of oil into the system.
TransCanada is still awaiting approval from the Obama administration to construct the US$5.4-billion northern portion of Keystone XL more than five years after it applied for a permit.
The company was able to move ahead with the Gulf Coast portion first because it doesn't cross the Canada-U.S. border.
Original Article
Source: huffingtonpost.ca
Author: CP | By The Canadian Press
Spokesman Shawn Howard says the company began filling the US$2.3-billion line with oil Saturday morning in Cushing, Okla.
That crude will eventually make its way to Houston-area refineries.
Howard says over the coming weeks, TransCanada will inject about three million barrels of oil into the system.
TransCanada is still awaiting approval from the Obama administration to construct the US$5.4-billion northern portion of Keystone XL more than five years after it applied for a permit.
The company was able to move ahead with the Gulf Coast portion first because it doesn't cross the Canada-U.S. border.
Original Article
Source: huffingtonpost.ca
Author: CP | By The Canadian Press
Saturday, October 26, 2013
Export Development Canada: How billions are transferred to Enbridge and TransCanada without substantive disclosure
The Enbridge Line 9 hearings are in process this week in Toronto. In Ontario, the reversal of that pipeline, to transport fuel from Western Canada eastward rather than refined fuel from Eastern Canada westward, has sparked public concerns.
These centre upon the risks that arise from moving corrosive diluted bitumen -- as opposed to refined products -- through populated areas, as well as the proposed 25 per cent capacity increase of the pipeline from 240,000 to 300,000 barrels per day.
These centre upon the risks that arise from moving corrosive diluted bitumen -- as opposed to refined products -- through populated areas, as well as the proposed 25 per cent capacity increase of the pipeline from 240,000 to 300,000 barrels per day.
Subscribe to:
Posts (Atom)






